| COMCAST PROPOSES FOR PROOF AND PULL 235 FT TO INSTALL FIBER OPTIC CABLE INTO EXISTING CONDUIT TO PROVIDE SERVICE TO 4715 ARAPAHOE AVE, BOULD | 4715 ARAPAHOE AVE, BOULDER |
Roofing and exterior | Aug 4, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO TIE IN TO EXISTING SPLICE AT MULTIPLE LOCATIONS NEAR 2950 PEARL, ST, BOULDER, CO 80301, INSIDE AND OUTSIDE THE ROW OF TH | 2950 PEARL ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PROOF AND PULL 375 FT OF FIBER OPTIC CABLE TO EXISTING CONDUIT TO PROVIDE SERVICE TO JPMORGAN - 2950 PEARL ST, BOULDER, | 2950 PEARL ST, BOULDER |
Roofing and exterior | Aug 4, 2026 | 1 | Under $250,000 |
| Relocate approximately ten (10) horizontal sidewall sprinklers from underneath the newly added soffits to the face of the soffits. Any soffi | 1128 PENNSYLVANIA AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| TI in existing tenant space. Addition of five notification devices to complete coverage. | 1881 9TH ST, BOULDER |
Major renovation | Aug 4, 2026 | 1 | Under $250,000 |
| PH5 PG4 - Install 35' class 5 pole & rebuild to existing framing | CONDITIONS OF APPROVAL: **speed limit must be reduced to 25 MPH when clos | 2266 EDGEWOOD DR, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH5 PG3 - Traffic control to replace primary meter **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 | 2930 19TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH5 PG2 - Install 1-35' Class 5 pole; rebuild wire to existing framing **contractor must notify impacted residents 72 hrs in advance; no-par | 2930 14TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH5 PG1 - Replace exiting tie on existing framing; move an existing splice case **working hours 9AM-3 PM on Broadway** **contractor must not | 2950 BROADWAY, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH4 PG3 - Install 2-45' class 2 poles; rebuild all poles to existing framing **contractor must notify impacted residents 72 hrs ina dvance; | 1412 ELDER AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH4 PG2 - Install 2-45' class 2 poles, and 1-50' fiberglass pole, rebuild all to existing framing **contractor must notify impacted resident | 2995 JEFFERSON ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG9 - Install 3 new poles & 840' of new tree wire & rebuild to existing framing; move splice case **contractor must notify impacted resi | 1007 CEDAR AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG 8 - Install 1-55' class 2 pole & rebuild to existing framing; retape secondary wire **contractor must notify impacted residents 72 hr | 900 DELLWOOD AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG7 - Install 1-35' class 5 pole and 1-45' class 2 pole, rebuild to existing framing and configuration **contractor must notify impacted | 980 DELLWOOD AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG6 - Traffic control to work on existing pole/infrastructure - retaping wire **contractor must notify impacted residents 72 hrs in adva | 815 ALPINE AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| JB 115997176 | PH1 PG8 - Crane set for pole replacement 1-45' class 2 pole at 1775 Linden Ave; pole installation near 19th st for 1-50' clas | 1775 LINDEN AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| WO 115837497 - Install new transformer & secondary open point for residential reinforcement **speed limit must be reduced to 25 MPH when clo | 2775 15TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| JB115997180 | 3 pole replacements **sidewalk closure for no more than 3 consecutive days** **bike lane merging with vehicular traffic requir | 2885 17TH ST, BOULDER |
Mechanical | Aug 4, 2026 | 1 | Under $250,000 |
| PH5 PG5 - Install 3 new poles - 1-45', 1-40', & 1-50'. Rebuild all wires to existing framing; move 3 splices from existing pole locations ** | 1330 CEDAR AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| Upsize water service from 3/4" to 1" **contractor must notify impacted residents 72 hrs in advace; no-parks must be placed 72 hrs in advance | 1535 UPLAND AVE, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| Heat pump Air Handler Installation **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for f | 2570 SUMAC AVE, BOULDER |
Mechanical | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG4 - Install 3-45' class 2 poles, install 1-40' class 3 pole and rebuild all to exiting framing **contractor must notify impacted resid | 3004 6TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG3 - Traffic control to replace and install a new 40' class 3 pole & rebuild to existing framing & configuration **contractor must noti | 2699 4TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH3 PG2 - Traffic control to install secondary hardware on existing equipment **contractor must notify impacted residents 72 hrs in advance; | 2801 3RD ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| PH2 PG4 - Closures to install 2 - 40' class 3 poles and reframe/rebuild existing configuration **contractor must notify impacted residents 7 | 3101 7TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| Replace existing gas furnace with 2.5 ton 16.8 SEER2 heat pump for single family dwelling - includes electrical **PLEASE NOTE: APPLICABLE ON | 170 S 31ST ST, BOULDER |
Mechanical | Aug 4, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair **contractor must coordinate restoration with property owner** | 1140 MONROE DR, BOULDER |
Other | Aug 4, 2026 | 1 | Subscribers |
| in-property wastewater service repair **contractor must coordinate restoration with property owner** | 1139 MONROE DR, BOULDER |
Other | Aug 4, 2026 | 1 | Subscribers |
| in-property wastewater service repair **contractor must coordinate restoration with property owner** | 1129 MONROE DR, BOULDER |
Other | Aug 4, 2026 | 1 | Subscribers |
| in-property wastewater service repair | 930 WAITE DR, BOULDER |
Other | Aug 4, 2026 | 1 | Subscribers |